Saturday 30 September 2017

Bedroom ceiling progress

Doug slaved away while I was away enjoying myself in London, and has nearly finished putting up the plasterboard. Still needs taping filling and sanding, then painting then lots of other things before we can move in. But all progress is good progress!

It is starting to look like a real room now.
The pink plasterboard is more fire resistant than the other and there is going to be a corridor of it to allow safe exit in the hopefully unlikely event of a fire. It is too expensive to use everywhere.

I didn't get great photos of this room when we looked around the house because the previous owner kept beehives in here so it was rather dangerous.


This window is now floor length and the horrible cladding was taken down some years ago by Rob. Looks a million times better now even not finished.

No comments:

Post a Comment