Wednesday, 25 October 2017

Bedroom progress

While I have been doing most of the tree planting Doug has been slaving away on the bedroom (with breaks to move animals, worm animals, strim some things as well as have fun walks with the dog etc).
Using the laser level to level the support for the top of the wardrobe - it will have 5 sliding doors along this length here with storage behind (that Doug is going to build also)

All level and fillered

Fillering the plasterboard round the window.

No comments:

Post a Comment