Now the downstairs living area is complete, Doug is working on the bedroom upstairs. He has put down insulation between the joists and put some sound damping stuff on the top of the joists and is now putting down the subfloor. He also had to cut in to one of the walls to find the joist that had been buried there by the hempcrete and plaster otherwise that bit of floor would have been unsupported. Not good as that is where the head of the bed will be.
Here he is doing a little dance to demonstrate how solid it is.

Here he is pointing out that the next thing after the subfloor is to finish the insulation round the front window and do all the plasterboard. This is going to be a big job as so much of the ceiling is out of easy reach and the plasterboard lift doesn't go that high.