Friday 11 March 2016

Dust, dust, mud and more dust

The knocker through man found that the wall is super solid and well built, which is good, but means it has taken quite a long time for him to break through

The lintel is in now and he expects it to take just a day or two now to finish making the hole and finishing it nicely as a doorway.
All this has resulted in a thick layer of icky dust on EVERYTHING despite attempts to contain it with plastic over the door. The bed is dusty, the bath is dusty, the sofa is dusty, the table is dusty, the floor is dusty, all the clothes are dusty. You get the picture.

Outside, the workmans van and our trailer (Doug has been getting sand for the plastering which will come soon) driving over the place and all the rain is nicely stirring everything in to mud. Which then gets walked in to the house by the dog and mixed together with the dust, beautiful.


No comments:

Post a Comment