Monday, 14 December 2015

Solar panels

I kind of mentioned it when I was talking about the heating, but the solar hot water panels are now connected up and generating heat. They were installed some time ago but have been covered up until now - and not connected to anything. They have raised the tank (2000 liters) by a few degrees each day it looks like. There were about 4 hours today that it was heating for (it was cloudy in the morning so startd at midday). The tank has been settling down and all coming to an equal temperature so we will see more clearly as time goes on. Of course at the moment we are not using any heat from it.
We hope to get the radiators working for a test run next week.
Free (ok not free - pre paid) heat!

Lots of the windows are fitted

Eventually the outside will be re rendered also which will cover the old bits showing round the edge of the new surround.

The bedroom

These windows in the roof will be replaced tomorrow. They will still be drafty round the sides as there is no insulation yet round the windows or above them. But overall the house envelope (as they call it) is getting more air tight.



Saturday, 12 December 2015

Window delivery

He is coming back next week to install.

Firing up the wood burner

The instructions seemed long and complex, but sure it is fine once we have done it a few times. There are a lot of dials and controls. Basically the whole setup isn't very complex, but it looks more so because it is important that water goes in to the tank at a level with similar temperature so that the water stays stratified with hot at the top and cold at the bottom otherwise we would have a large tank of warmish water rather than one which is hot enough at the top to provide water for showers. Then there are a number of pumps and dials for the solar hot water and for the wood burner.
The radiators are connected up basically but not fully yet.
The red tank you can see a bit of is the expansion vessel to cope with the water increasing in volume as it gets hotter. The grey pipes just right of center are the solar hot water going in and hot water coming out. The wood burner is on the left.

Lighting the wood burner

Control panel on the wood burner - tells you whether fans are on, temp of chimney (which is important I guess so that the boiler can control itself to achieve the correct temperatures and air supply to achieve gasification)

The super hot flame roaring down from where the wood is being heated to create wood gas above. The boiler is called a wood gasification boiler because it burns the wood very efficiently by gasifying the wood and then burning that gas

The tank on right is to provide flow if there is a power cut and the system is too hot and needs cooling - as we would have no water pressure at that point as our water is provided by a pump

Double skin chimney out the back



Friday, 11 December 2015

New Cockerel

Someone gave us a cockerel to eat. He is the same breed as our two ginger chick (which are Warrens) who are super friendly, so we decided to keep him instead of our current guy (who is for the pot now) so that when we have chicks hopefully we will get a few more friendly chickens. They are meant to be good egg layers too. We do like the Marrans (we have three, and the old cockerel is this breed) because they lay well in the winter, maybe half Warran half Marrans will lay in winter AND be friendly.


Heating is in (it is HUGE)

Look at the size of it! Although we did technically know the dimensions of the 2000 liter water tank, we hadn't taken on board just how huge it would be.
I am also wondering how on earth we are going to plaster the wall behind it... We could just leave it, but the hempcrete is quite crumbly and I imagine eventually it would all fall off, so we probably need to get a layer of something over most of it somehow. Maybe we could send a small child back there?!?
More photos in better light tomorrow, and we are getting a lesson on how it all works (plus I think there are a few final bits to do still). There are a lot of dials.
Excitingly the window man is coming tomorrow to deliver the windows too. Then fitting them next week.


Tuesday, 8 December 2015

Exciting progress

Here is the water tank 2000l ie HUGE. Quite a challenge fitting it under the beam apparently.

In the door is the wood burner - quite big

In addition there is a 200l expansion vessel to adjust as the volume of the water increases with temperature and a 300l emergency flow pressure vessel to provide cold water flow to quench fire in case of a power cut at peak temperature.
Will it all fit on the tiled area!? Also stress because the emergency flow vessel still has to turn up - due tomorrow. 
Exciting!