This photo doesn't do it justice (the grass is out of control!)
We now need to clad the inside of the roof, then we will finish the insulation upstairs in the house, then put a concrete floor in this area and plumbing for a sink. Eventually we will re-render and paint the front and re-point the walls inside as well (but after various other work on the inside of the house).
After all that our intention is to dig out and concrete (with some insulation under) the garage, then install the hot water and heating system (wood gasification boiler and solar pv? thermal?) in there along with a temporary toilet and shower. But more on that plan later when we have worked it out more.