Doug is busy leveling the top of the joists so that the floor in the bedroom is sufficiently flat. A few of the joists were a bit weedy and have been replaced, there was also a spot that had had a ladder between the two floors where a bit of one of the joists had been removed.
This is making lots and lots of wood shavings and saw dust as bit have to be planed and sanded flat. I think it is approaching finished although there are some tricky bits round the edge still to do - where the existing joist has been buried in the hempcrete and so an additional bit needs bolting to it so that the floor is supported at the edge.
No comments:
Post a Comment