Friday 7 November 2014

Men at work

'

We are hoping to buy a second car this weekend so that the truck can stay here during the week and be used to get gravel and sand from the quarry and various other useful things.

Work has progressed well on the outdoor kitchen. Despite the weather being much less nice than it has been for some time. It really feels like winter is starting.

The supports holding the chimney breast have gone (and it has stayed up!) and the floor of the inside bit is all dug out and levelled with sand ready for the concrete next week.

In the outside room the bits of the plumbing that will go under the floor, ready for the sink, are in place.

We can't do the gutter piping to take the water away from the house until we do the drain along the back (we are going to get a mini digger for that and other things!). So in the mean time some channels have been dug to try to guide it away a bit in the hope it will soak in to the ground away from the house.






No comments:

Post a Comment